Kilowatt Miles
Charging

EVgo Launches First NACS Supercharger in Chicago

EVgo has opened its first Supercharger station in Chicago, a 12-stall site with NACS connectors and Magic Dock adapters for Tesla and non-Tesla EVs.

EVgo has opened its first Supercharger station in Chicago, a 12-stall site with NACS connectors and Magic Dock adapters...

EVgo has opened its first Supercharger station near downtown Chicago. The 12-stall site at Riverside Square & River's Edge features Tesla hardware and supports both Tesla and non-Tesla electric vehicles without the need for a driver-supplied adapter.

The station uses Tesla V3.5 Superchargers with V4 dispensers, offering a maximum output of up to 325 kilowatts. It is equipped with Tesla's Magic Dock technology, which provides an integrated NACS-to-CCS1 adapter. Pricing varies by time of day, offering a lower rate during overnight hours.

FeatureDetail
LocationRiverside Square & River's Edge, 3145 South Ashland Ave, Chicago
Number of Stalls12
Max Power OutputUp to 325 kW
Connector TypeNACS with integrated Magic Dock (CCS1 adapter)
Overnight Rate$0.25
Peak Rate (11 a.m. to 8 p.m., per kWh)$0.35

NACS Integration Expands Market Access

The new station's Magic Dock technology is central to EVgo's strategy. By supporting both native NACS and CCS vehicles, the company effectively doubles its addressable market. Tesla drivers can now see EVgo locations with NACS-equipped stalls directly in their vehicle's navigation system, following an integration completed in early September.

EVgo had already installed nearly 300 NACS connectors on its existing chargers prior to this launch. The company aims to have a NACS connector at every site built in 2023 or later within two years, with a goal for full network coverage by late 2028.

EVgo's NACS Expansion Strategy

This Chicago site is the first deployment under EVgo's agreement to use Tesla hardware via the Supercharger for Business program. The company plans a rapid expansion of NACS-compatible charging. EVgo intends to increase its NACS connectors from over 100 at the start of the year to 500 by the end of 2026.

Hundreds of Supercharger stalls are planned for installation nationwide. The company operates more than 1,200 fast charging locations across 47 states, comprising over 5,400 stalls. It is also developing next-generation charging architecture at its Innovation Lab.

Broader Network and Market Context

EVgo CEO Badar Khan stated that deploying the first Supercharger marks an important milestone for growing the customer base and supporting the industry's shift to the NACS standard. The site is located at a grocery-anchored property owned by Regency Centers, with which EVgo has a partnership to deploy more than 400 additional DC fast-charging stalls.

The launch addresses growing demand in a key market. Illinois electric vehicle registrations grew nearly 60% over the last two years. While EVgo initially announced plans for 500-kW Superchargers, it is currently installing these lower-power units, with plans to deploy 500-kW V4 hardware in the future. The company's controlling shareholder, LS Power, recently offered to take the company private.

EVgo plans to install hundreds of Supercharger stalls nationwide, with 500 NACS stalls expected by the end of 2026.

Related coverage

More from Charging